We constantly strive to implement the circular economy principles in all our projects at all levels

prototype

01

The Showroom

This is the first structure built using the last iteration of the circular slab system and it is currently in use as a prototyping space

02

Boat House

This is the first privately owned circular building. It`s garage stores the boat while the main room is used for relaxation and a changing area.

boat house
bathing house

03

Bathing House

Similar to the Boathouse, this building serves as a relaxation point next to the lake Zurich. 

- In permitting process

04

School Extension

This building serves as a temporary multifunctional school room.

-  Project stage

school extension
barracks

05

Adaptable army barracks

Due to security reasons many Army buildings become unused therefore the need for relocatable army barracks is evident. 

- Project stage

06

Office building

​The 7 story office building was designed to sit on a narrow plot over a 10 years period then reused in a larger development.

-Project stage

office