Our Work
We constantly strive to implement the circular economy principles in all our projects at all levels
01
The Showroom
This is the first structure built using the last iteration of the circular slab system and it is currently in use as a prototyping space
02
Boat House
This is the first privately owned circular building. It`s garage stores the boat while the main room is used for relaxation and a changing area.
03
Bathing House
Similar to the Boathouse, this building serves as a relaxation point next to the lake Zurich.
- In permitting process
04
School Extension
This building serves as a temporary multifunctional school room.
- Project stage
05
Adaptable army barracks
Due to security reasons many Army buildings become unused therefore the need for relocatable army barracks is evident.
- Project stage
06
Office building
​The 7 story office building was designed to sit on a narrow plot over a 10 years period then reused in a larger development.
-Project stage